Aqmos R2d272 Installation Verified -

: Must be between 2.0 and 6.0 bar. If pressure exceeds 6 bar, a pressure reducer is mandatory. 2. Physical Installation Steps Follow these steps to physically connect the system:

: Secure the wastewater hose to the system's drain port with a hose clamp and lead it to your drain system. aqmos r2d272 installation verified

: Install the bypass valve on the back of the control head, securing it with the provided clips and screws. : Must be between 2