If the calculated width for the final row is less than 2 inches, rip down the width of the very first row to balance the floor.

Place the unopened flooring boxes flat in the room for at least 48 hours prior to starting. The room temperature should stay between 60°F and 80°F.

and speed square (For scoring and snapping planks) Rubber mallet and tapping block (To safely lock joints) Pull bar (To tighten final planks against walls) Tape measure and chalk line (For room layout) Oscillating multi-tool (To undercut door jambs) 📋 Step-by-Step Installation Process 1. Acclimate and Prep the Space

Before beginning your installation, gather the necessary supplies:

(If your product does not have a pre-attached pad) 1/4-inch spacers (To maintain the required expansion gap)

Carefully remove existing baseboards and transition strips using a pry bar.